2021 Honda Civic Pump Complete, Water
OEM 19200-59B-003Cocok untuk Honda Civic 2016–2021
Water pumps
$5–20
kisaran harga pabrik (FOB)
2
pabrik terverifikasi
MOQ 50
minimum terendah
15–30d
waktu produksi
Minta penawaran pabrik →Gratis · satu permintaan menjangkau semua 2 pabrik · penawaran dalam 48 jam
Siapa yang membuat suku cadang ini
Anhui Toba Auto Parts Co., Ltd. ✓ · Chizhou · Engine pump factory (Chizhou, Anhui,…est. 2013Guangzhou SVD Auto Parts Co., Ltd. ✓ · Guangzhou · Japanese and Korean OE-replacement…est. 2003
Semua 2 pabrik →
| Pemasok | Harga FOB | MOQ | Pengiriman |
|---|---|---|---|
| Anhui Toba Auto Parts Co., Ltd. | $5–5.90 | 50 | 15–30d |
| Guangzhou SVD Auto Parts Co., Ltd. | $16–20 | 50 | 15–30d |
Cocok untuk kendaraan ini
- Honda Civic · 2016 2017 2018 2019 2020 2021
Referensi silang
MSRP $118.65
Suku cadang terkait
Sourcing FAQ — 19200-59B-003
- What is the FOB price for 19200-59B-003 (2021 Honda Civic Pump Complete, Water) from Chinese manufacturers?
- Verified factories quote 5–20 FOB for 19200-59B-003, sourced across 2 suppliers. Final pricing depends on order volume, material grade and required certifications.
- What is the minimum order quantity (MOQ) for 19200-59B-003?
- MOQ for 2021 Honda Civic Pump Complete, Water (OEM 19200-59B-003) starts from 50 units; higher volumes typically unlock better FOB pricing and shorter lead times.
- What is the production lead time for 19200-59B-003?
- Typical production lead time is 15–30d after order confirmation, depending on factory capacity and order size.
- Which vehicles does 19200-59B-003 fit?
- 2021 Honda Civic Pump Complete, Water (OEM 19200-59B-003) fits 1 verified platform, including Honda Civic. Confirm the exact year and trim against your VIN before ordering.
- How do I verify a factory for 19200-59B-003 before ordering?
- Request the factory's business license, ISO/IATF 16949 quality certification and recent test reports for 2021 Honda Civic Pump Complete, Water. Order a pre-production sample and confirm the OEM number 19200-59B-003 matches your application before committing to an MOQ.